In just one day, major steps have happened.
The veluxes are in and the floor is (mostly) down:
Corridor:
Veluxes, nice and big:
And the soldiers finished, floor level in:
Those veluxes again:
Flooring:
Plumbing first fix comes next week:
And the decorating begins upstairs – this is the diluted undercoat to seal the plaster but already the room looks so much cleaner and spacious:
A More Space technical drawing?
Veluxes from the top:
And feet on the new Juliette balcony, finally in:
The roofline:
Leading around the bathroom window:
Tiling in the loft bathroom:
Apertures for shampoos etc:
Bricking up over the steels in the study: