Since I last wrote we’ve been away from holiday but progress has been swift. He’s an update:
- Boiler – we have one and it’s warming the house. It’s great to have the place warming up and gently drying out
- Utility room – the first cupboards are in and despite a sink being the wrong side, it’s starting to take shape
- Flooring – probably the biggest improvement, the oak flooring is down in the hall, downstairs loo and most of the lounge and dining room – looks really fab, just hope we can protect it enough until all the heavy work is done
- Windows arrived – and they look great. They’ve been prefabricated off site and are already first-coat painted which saves them from the winter weather. I can’t wait to see them in.
- Doors and handles on – looks great
- Lounge fireplace is in – really grand, it’s the original one from the rear dining room with a refurbished grate, and a new black slate hearth.
- Dining room secured and almost complete
- Bathroom calamities – we need to make some changes to the bathroom layout cause we cocked up – more later…
The original fireplace from the rear dining room is now reinstated rather grandly in the lounge (needs cleaning):
The brick feature in the dining room looks good – although we’re getting rid of the dodgy brick hearth which didn’t turn out as planned
New doors between the lounge and dining room:
Dining room door into kitchen, just waiting for the extension to be built…
Refurbished original fireplace – it’s going to have a gas fired coal-effect fire installed in due course
Door handles now on:
Utility room starts to take shape:
Nice detail in the cupboards – that’s hard to do right:
Storage cupboard from Ikea:
Bathroom, we have some changes to make here:
Door frames are on –
We’ve got a bunny boiler in our house
The house is warm now and the plaster is drying out