Big progress

Tim · December 11, 2007 · 2 min read.

Since I last wrote we’ve been away from holiday but progress has been swift. He’s an update:

  • Boiler - we have one and it’s warming the house. It’s great to have the place warming up and gently drying out
  • Utility room - the first cupboards are in and despite a sink being the wrong side, it’s starting to take shape
  • Flooring - probably the biggest improvement, the oak flooring is down in the hall, downstairs loo and most of the lounge and dining room - looks really fab, just hope we can protect it enough until all the heavy work is done
  • Windows arrived - and they look great. They’ve been prefabricated off site and are already first-coat painted which saves them from the winter weather. I can’t wait to see them in.
  • Doors and handles on - looks great
  • Lounge fireplace is in - really grand, it’s the original one from the rear dining room with a refurbished grate, and a new black slate hearth.
  • Dining room secured and almost complete
  • Bathroom calamities - we need to make some changes to the bathroom layout cause we cocked up - more later…

The original fireplace from the rear dining room is now reinstated rather grandly in the lounge (needs cleaning): The brick feature in the dining room looks good - although we’re getting rid of the dodgy brick hearth which didn’t turn out as planned New doors between the lounge and dining room: Dining room door into kitchen, just waiting for the extension to be built… Refurbished original fireplace - it’s going to have a gas fired coal-effect fire installed in due course Door handles now on: Utility room starts to take shape: Nice detail in the cupboards - that’s hard to do right: Storage cupboard from Ikea: Bathroom, we have some changes to make here: Door frames are on - We’ve got a bunny boiler in our house The house is warm now and the plaster is drying out