We inch ever closer to our move in date.
Here’s a few highlights as the kitchen nears completion:
Shed – now with 4 new panels to replace the rotten ones:
And from the outside:
And painted, one coat:
Hopefully a bit more waterproof:
TV amplifier – the cupboard’s looking a little bit of a tangle right now:
Desk on the study:
Skirting boards getting cleaned and finished in the hall:
Door receiving some attention (and paint):
Getting there:
Front room is still full of stuff:
And the dining room too:
Island units, now with handles and sink – it’s also been measured for Corian worktop – which comes in three weeks:
Oven and microwave and fridge freezer on the right:
And the full unit:
Cooker run: (missing the hob right now):
And the under-cupboard lights prepped:
Telescopic hood:
And under:
In-built socket (in the cupboard wall to allow for glass splashback to come later on the back wall):
And the neat back of the socket:
Dishwasher, ready:
Freezer:
Fridge freezer under:
Big fridge – should be room for enough vegetables in there:
The full effect?
And side on:
Spanners in the works?
And the grouting on the floor in the loft bathroom is finished finally: