Jump to the start of the house renovations.

Continual improvement

By Tim · May 29, 2008 · 1 min read.

We’re still stepping, slowly, towards an inevitable move in date. Whether we’ll be “builder free” at the point of moving in - or whether there will still be work to do, is difficult to figure out. Peter had to return to Poland for a bit which was a shame as far as progress is concerned. Hopefully he’s back on site tomorrow - otherwise we will be stuck.

We still need the kitchen done.

On the plus side the new appliances turned up today and it will be possible to finish the work before we move in if they knuckle down now.

I got down and dirty and carpeted the storage area neatly: (first time carpeting for me)

New bike fits in new shed (now with more suitable internal and external bolts):

And closed:

Our garden shed, now neatly painted:

Inside the dressing room, the new shelves and boxed areas are done and painted:

They matched our diagrams nicely:

And again:

And the loft getting close:

We painted the shed

By Tim · May 25, 2008 · 1 min read.

It may not seem like much but it was significant step in our transforming our tired old house into our fresh and new home. The neighbours tell us that to their knowledge, the shed has received no maintenance in the 10 years they have lived next door. In which case it’s amazing the wood is not in bad nick and the felt on the roof is intact. We cleared out the junk lying behind the shed and rubbed the old creosote off it. The rear of the shed has obviously been damp for a while and was hence rotten and woodwormy. We stripped four of the cladding boards and cut out the base of the frame. A trip to Homebase got us some fresh wood and I fashioned a replica of the bit we’d cut out. Although it’s not yet finally fitted (I couldn’t find and replacement cladding yet), we were quite pleased with the result and the new colour (racing green) is rather fresher. Other plans for the garden include some decking outside the kitchen, a couple of raised beds for vegetables, space for a small chicken coop and possibly a little seating area at the bottom of the garden for catching the final rays of the sun. It’s going to be perfect.

Getting there now

By Tim · May 25, 2008 · 1 min read.

We’re just two weeks away from our moving in weekend now. Sometimes it feels like we’re really close and other times, so far away. But in truth I think we will be ready to move in then.

The carpets are laid now - took three guys just 5 hours to lay two floors of carpet and underlay. And so, apart from some wardrobes being built in to the loft, and some snags in the two bathrooms, the top two floors of the house are, to-all-intents-and-purposes done. Seems amazing.

Downstairs, the paint is mostly there and the kitchen is a work in progress.

The lovely Peter (Polish) is our main man on site, although he had to rush to Poland the other night to see his dying mother. He is supervised competently by Val - the sole reason we still like More Space because he is willing to look after us.

Here’s some photos:

S loves her new kitchen items:

And admires the doors:

Stud walling to go around the cupboards:

Corridor of cupboards (two of which need to be swapped):

Kitchen island - sink too big… hole needs cutting;

Drawers:

And more:

Inspecting:

Studding:

Plans:

Underfloor heating thermostat etc:

Carpet! Study looking finished:

Wardrobe handles:

Small doors:

Loft, nearly there:

And again:

Loft bathroom:

Landing 2:

Landing 1:

On the roof

By Tim · May 21, 2008 · 1 min read.

I was on the roof at the weekend fixing the TV aerial - although I still have to go back and out a mast up and finish it.

Chimney with the brace for the TV aerial:

TV aerial ready to go (need a mast):

Domelights:

Our domelight:

Roof:

Velux - and how I got on the roof:

Kitchen arrives!

By Tim · May 21, 2008 · 1 min read.

The kitchen itself turns up (and in one day is laid out):

The start of the island:

Contrasting wood and white:

Corridor of white:

The worktop:

Handles:

Hinges:

Drawers:

Graphite oak doors, fortunately behind plastic by now:

Floor laid

By Tim · May 21, 2008 · 1 min read.

Floor laid:

Shower screen for the 1st floor bathroom:

Door for the tricky dressing room in the loft:

Finished:

Painting of the doors:

Architrave around the door:

Patio doors to come:

The floor is tiled:

Tiles now match the level of the wood floor: