There are some changes now required to the current site as a result of all the shennanigans this week but those’ll happen next week. Here’s the current state of play:
Back of the house and something close to resembling a new doorway, note the “pin” holding things up (more of those to come):
New wall – we’re quite pleased with the way it’ll blend in to the old:
Entire back of house
New wall:
Will it match the neighbour’s?
Side return, need to measure it:
Padstone we shouldn’t have had – needs to come out:
Drain and manhole which needs to move:
Rear corner:
Damp proof course:
From inside the house of horrors:
Upstairs bathroom, space for a toilet, nearly done:
Loft nearly complete: